top of page
About
Anchor 1
About Us
![A curved concrete Stairs formed by Tigerform](https://static.wixstatic.com/media/fa5f68_2b2a39e685b746a89b4010b552497793~mv2.jpg/v1/fill/w_98,h_130,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_avif,quality_auto/fa5f68_2b2a39e685b746a89b4010b552497793~mv2.jpg)
![TIGERFORM (White)-01.png](https://static.wixstatic.com/media/fa5f68_35d116cd3d1b406da9f9931c351fdab2~mv2.png/v1/crop/x_729,y_1386,w_4792,h_3480/fill/w_133,h_97,al_c,q_85,usm_0.66_1.00_0.01,blur_3,enc_avif,quality_auto/TIGERFORM%20(White)-01.png)
Sorrento Ferry Terminal
Established in 2018, Tigerform is a full-service concrete structure contractor with its core competency in formwork.
It was brought together by Steve, James, Dan and Iain to create a specialist contractor with the aim of becoming a sector leader in quality, cost and safety.
Tigerform brought together the directors separate business interests under one umbrella to further enhance their existing strengths and grow the business in a sustainable way focusing on establishing excellent business relationships with our core clients.
Combining the wealth of project management experience possessed by the Company’s directors, and the enthusiasm and drive of our site supervisors, we have the capabilities to take on even the most complex projects.
Full service formwork contractor with experience to carry out a wide range of formwork projects including but not limited to:
-
Suspended Slabs Insitu columns, walls and stairs
-
Off-Form Concrete
-
Precast Installation
Groundworks including:
-
Basic bored piers Excavation and spoil removal
-
Preparation of ground slabs
Concrete supply and place.
Reinforcement supply and place.
Services
![TIGERFORM (White)-01.png](https://static.wixstatic.com/media/fa5f68_35d116cd3d1b406da9f9931c351fdab2~mv2.png/v1/crop/x_729,y_1386,w_4792,h_3480/fill/w_133,h_97,al_c,q_85,usm_0.66_1.00_0.01,blur_3,enc_avif,quality_auto/TIGERFORM%20(White)-01.png)
Facilities, Equipment and Workforce
-
20,000 m2 of Conventional formwork
-
Yard facilities based in Moorabbin & Seaford
​​
-
​​80 staff including 10 foremen 4 crane trucks, Concreters Truck, 3 telehandlers, 2 Scissor lifts and other items of small plant.
-
13t Excavator with Tilt Hitch, 8t and 3t Excavators.
​​
-
Skidsteer with 4-way bucket, forks and spreader bar
-
​Concrete Placing Boom
-
Perimeter Safety Screens
![TIGERFORM (White)-01.png](https://static.wixstatic.com/media/fa5f68_35d116cd3d1b406da9f9931c351fdab2~mv2.png/v1/crop/x_729,y_1386,w_4792,h_3480/fill/w_133,h_97,al_c,q_85,usm_0.66_1.00_0.01,blur_3,enc_avif,quality_auto/TIGERFORM%20(White)-01.png)
![TIGERFORM (White)-01.png](https://static.wixstatic.com/media/fa5f68_35d116cd3d1b406da9f9931c351fdab2~mv2.png/v1/crop/x_729,y_1386,w_4792,h_3480/fill/w_133,h_97,al_c,q_85,usm_0.66_1.00_0.01,blur_3,enc_avif,quality_auto/TIGERFORM%20(White)-01.png)
Projects
bottom of page